Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u301885354/domains/tecnomedida.com/public_html/wp-includes/functions.php on line 6114
Pruebas S/E Encapsuladas GIS - Tecnomedida
Buscar
Cerrar este cuadro de búsqueda.

Pruebas S/E Encapsuladas GIS

SE Movil

Disponemos de amplia experiencia en instalaciones S_E Encapsuladas GIS en hexafluoruro de azufre (SF6). 

Las pruebas realizadas en Subestaciones Encapsuladas son esenciales para garantizar su funcionamiento seguro y eficiente.

Some of the common tests include main busbar testing, disconnectors, circuit breakers, current and voltage transformers, cable terminals, and connecting elements, in addition to:

  • Detección y cuantificación de las fugas de gas (SF6) en GIS
  • gas filling (SF6)
  • preventive maintenance of power switches
  • preventive maintenance of disconnectors
  • electrical tests for CT/PT
  • high potential AC/DC electrical tests

Estas pruebas son realizadas por personal calificado y utilizando equipos de prueba calibrados Los resultados de los ensayos son documentados de manera detallada. Las pruebas regulares y el mantenimiento son esenciales para garantizar que las Subestaciones Encapsuladas GIS funcionen de manera segura y eficiente a lo largo del tiempo.